- Thermal and mechanical design of HRSG (preferably 3 pressure reheat configuration for F class Gas turbines)
- Development of performance guarantee test procedure as per ASME PTC 4.4
- Carrying out PG test at site as per ASME PTC 4.4.
- Use of proprietary/commercially available software for HRSG thermal design
- Engineering of other bottoming cycle equipment like Deaerator, BFPs, Turbine bypass system and Power cycle piping.
- Managing interfaces with GTG and STG vendors
- Development of off design and part load performance.
Experience – 18 – 25 Years
Srikanth Nyshadham +91-98665-06729
Basics of Boiler and HRSG Design
0 comments:
Post a Comment